Construction Updates
Terry and his crew have already done amazing work on the Education Building! The new Blowing Rock Cares space has already been framed out, and the crew will begin work on the stairwell that will connect the BR Cares space to the main floor of the Education Building next week. You can peek in the windows in that space, but please note that it is an active construction site and traffic will not flow through that entrance for the time being.
The Handicap Accessible Entrance that was through the nursery area will not be accessible for the time being. If you need an accessible entrance to the church on Sunday mornings, the best thing to do is enter through the accessible street entrance on Main Street. The Fellowship Hall side door will also be open on Sunday mornings, and you can access the elevator through that space. Thank you in advance for your flexibility as we get into more construction!